Home » Santa Clarita News » Caltrans Implements Road Closures On I-5 For Construction Of A New Truck Lane

Caltrans Implements Road Closures On I-5 For Construction Of A New Truck Lane

NEWS RELEASE | MOTORIST ADVISORY

A new project on the freeway will be the construction of a truck lane on the Southbound I-5 between Pico Canyon Road/ Lyons Avenue and the Antelope Valley Freeway (SR-14).  


Don’t miss a thing. Get breaking Santa Clarita news alerts delivered right to your inbox.


The California Department of Transportation (Caltrans) plans to implement closures that are listed below.  There will be staggered ramp closures, signed detours and no unusual levels of dust, noise or vibration are expected. Closures are subject to change.

Please be attentive to road closures, slow for the cone zone, and move over one lane where possible to keep motorists and the construction crew safe.

Lane closure information for this and other freeway projects is available on the Caltrans website:http://www.lcswebreports.dot.ca.gov/lcswebreports/

Call 511 for real-time traffic information or visit go to 511.com.

Closure Dates: Sunday, July 14, through Saturday, July 20, 2013

NORTHBOUND I-5

Lanes

  • Up to three lanes of northbound I-5 between the end of the existing truck lane and Lyons Ave.9 p.m. to 5 a.m.

Note: At least one lane will be open at all times. The most restrictive closures (i.e., the most lanes closed) will occur between 1 a.m. and 4 a.m.

SOUTHBOUND I-5

Lanes

  • Up to three lanes of southbound I-5 between Lyons Ave. and the end of the existing truck lane — 9 p.m. to 5 a.m.

Note: At least one lane will be open at all times. The most restrictive closures (i.e., the most lanes closed) will occur between 1 a.m. and 4 a.m.

Connector

  • I-5 to northbound SR-14 — 9 p.m. to 6 a.m. and 9 a.m. to 3 p.m.

Off-Ramp

  • Calgrove Blvd. — 9 p.m. to 6 a.m. and 9 a.m. to 3 p.m.

About the Project

The project is adding a truck lane to the outside of southbound I-5 by paving the median area and outside shoulder, and shifting the mixed-flow lanes inward. Median retaining walls and two short sections of outside retaining walls will be built to accommodate this widening.

The truck lane will extend from Pico Canyon Road/Lyons Avenue to SR-14, a distance of 3.7 miles.

This project will ease traffic delays, improve goods movement, absorb traffic growth due to population increase (both residential and commercial), and enhance safety by separating truck traffic from passenger vehicles.

Construction began in May 2012 and will be completed in 2014. Funds administered by Metro.

For more information, visit www.I-5info.com.

 


Do you have a news tip? Call us at (661) 298-1220, or drop us a line at community@hometownstation.com.


Caltrans Implements Road Closures On I-5 For Construction Of A New Truck Lane


Article: Caltrans Implements Road Closures On I-5 For Construction Of A New Truck Lane
Source: Santa Clarita News
Author: Newsroom


Caltrans Implements Road Closures On I-5 For Construction Of A New Truck Lane

Leave a Reply

Your email address will not be published. Required fields are marked *

*

This site uses Akismet to reduce spam. Learn how your comment data is processed.

About KHTS FM 98.1 & AM 1220

As Santa Clarita’s only local radio station, KHTS FM 98.1 & AM 1220 mixes in a combination of news, traffic, sports, along with your favorite adult contemporary hits by artists such as Rob Thomas, Taylor Swift, Katy Perry and Maroon 5. We are vibrant member of the Santa Clarita community. Our broadcast signal reaches all of the Santa Clarita Valley and parts of the high desert communities located in the Antelope Valley. We stream our talk shows over the web, reaching a potentially worldwide audience.